logo SEA – Steer Environmental Associates Ltd.

Hazardous Building Material Risk Assessment and Exposure Control Plan Development

Steer Environmental Associates Ltd. works with clients and contractors to develop risk assessment (RA) and exposure control plan (ECP) documents where hazardous materials are confirmed. RA and ECP documents are tailored to satisfy WorkSafeBC requirements on a project-specific basis and outline determinants of risk to receptors from HazMat, risk classification, and requirements for safe work procedures including containment, controls, personal protective equipment (PPE), decontamination, and monitoring associated with renovation, demolition, maintenance, restoration, and/or abatement activities that may disturb the HazMat.

Contact us today to book your Hazardous Materials Risk Assessment