logo SEA – Steer Environmental Associates Ltd.

Projects: All

Selkirk College 10th Street Campus Annex Building Mold Assessment

Steer Environmental completed a mold assessment for the Annex Building located at the Selkirk College 10th Street Campus in Nelson, BC. The assessment was completed in accordance with applicable WorkSafeBC Guidelines and the Occupational Health and Safety Regulation (OHSR). The objective of the assessment was to investigate suspected mold issues within the building resulting from […]

Read more...

Phase I Environmental Site Assessment – Waneta Manor Apartments

Steer Environmental Associates conducted a Phase I Environmental Site Assessment (ESA) of a residential apartment building in Trail, BC, for environmental due diligence and financing purposes, and to comment on associated environmental risks and liabilities. The Phase I ESA was comprised of a records review, site inspection, and interviews to determine the potential for chemical […]

Read more...

Phase I Environmental Site Assessment – Shaughnessy Apartments

Steer Environmental Associates conducted a Phase I Environmental Site Assessment (ESA) of a residential apartment building in Nelson, BC, for environmental due diligence and financing purposes, and to comment on associated environmental risks and liabilities. The Phase I ESA was comprised of a records review, site inspection, and interviews to determine the potential for chemical […]

Read more...

Phase I Environmental Site Assessment – Proposed Residential Development

Steer Environmental Associates conducted a Phase I Environmental Site Assessment (ESA) on behalf of the private owner of a residential property comprised of two single-family dwellings and outbuildings in Coquitlam, BC, for environmental due diligence and financing, and to comment on associated environmental risks and liabilities. The Phase I ESA was comprised of a records […]

Read more...

Phase 2 Environmental Site Assessment

Steer Environmental Associates completed a Phase 2 Environmental Site Assessment (ESA) for the City of Nelson at a former hydro-electrical substation in Nelson, BC, for environmental due diligence associated with waste management and subsequent redevelopment of the site. Steer Environmental reviewed past reports pertaining to the site which identified five (5) areas of environmental concern […]

Read more...

Asbestos Contamination Assessment in Vermiculite Insulation

Steer Environmental completed an assessment for asbestos contamination in vermiculite insulation prior to potential transaction of a private residence located in the Fairview area of Nelson, BC. The assessment was completed in accordance with applicable WorkSafeBC Guidelines and the Occupational Health and Safety Regulation (OHSR). The objective of the assessment was to investigate the potential […]

Read more...

Asbestos Indoor Air Quality Assessment

Steer Environmental completed an indoor air quality assessment prior to potential transaction of a private residence containing an asbestos-concrete coated boiler unit in the Uphill area of Nelson, BC. The assessment was completed in accordance with applicable WorkSafeBC Guidelines and the Occupational Health and Safety Regulation (OHSR). The objective of the assessment was to investigate […]

Read more...

Residential Hazardous Materials Assessment

Steer Environmental completed a mold assessment for a private residence constructed in 1930 and located in Rossland, BC. The assessment was completed in accordance with applicable WorkSafeBC Guidelines and the Occupational Health and Safety Regulation (OHSR). The objective of the assessment was to investigate the potential presence and extent of hazardous materials within the residence […]

Read more...

Selkirk College Castlegar Campus Sentinel Building Indoor Air Quality Assessment

Steer Environmental completed an indoor air quality (IAQ) assessment for mould in a lecture room within the Sentinel Building located at the Selkirk College Campus in Castlegar, BC. The assessment was completed in accordance with applicable WorkSafeBC Guidelines and the Occupational Health and Safety Regulation (OHSR). The objective of the assessment was to investigate complaints […]

Read more...

Pre-Renovation Asbestos Survey

Steer Environmental completed a pre-renovation asbestos survey for a private homeowner client in Trail, BC. The survey identified potential asbestos containing building materials (ACBM) in bathroom and attic areas of the residence. In accordance with Section 6.1 of the WorkSafeBC Occupational Health and Safety Regulation (OHSR), and Safe Work Practices for Handling Asbestos, ACBM samples were […]

Read more...